Condition and Performance Monitoring of Blowout Preventer (BOP) at Transocean
Mete Mutlu, John Kozicz, Transocean, Inc.
A blowout preventer (BOP) is an expensive pressure control safety device used during drilling and completion of wells. Approximately 50% of the unplanned downtime for an offshore drilling rig is caused by the BOP. Providing a solution that improves the availability of a BOP will benefit the drilling process and safety. Transocean performed CPM of a BOP using an adaptive physics-based modeling approach with Simscape. They demonstrate its success on a BOP using data collected from the PI systems of an offshore drilling rig. In addition, they talk about approaches to radically shorten the process of operationalizing engineering analytics projects with the deployment capabilities of MATLAB.
Published: 20 Dec 2018
Featured Product
Simscape
Up Next:
Related Videos:
Web サイトの選択
Web サイトを選択すると、翻訳されたコンテンツにアクセスし、地域のイベントやサービスを確認できます。現在の位置情報に基づき、次のサイトの選択を推奨します:
また、以下のリストから Web サイトを選択することもできます。
最適なサイトパフォーマンスの取得方法
中国のサイト (中国語または英語) を選択することで、最適なサイトパフォーマンスが得られます。その他の国の MathWorks のサイトは、お客様の地域からのアクセスが最適化されていません。
南北アメリカ
- América Latina (Español)
- Canada (English)
- United States (English)
ヨーロッパ
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
アジア太平洋地域
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)