HDL Coder: Matlab stops working at code generation when generating high-level timing critical path report (Matlab 2015b)

Hello, I try to generate HDL code of a quite complex model for my Zynq. The code generation itself works and I can generate the bitstream for my target. Now I am interested in the “high-level timing critical path report” to compare the design with another. But when I check the checkbox “generate high-level timing critical path report” Matlab stops working at code generation after a while. (Windows error massage popup and force me to close Matlab). What could be the source for this problem?
Regards, Stephan

回答 (1 件)

Kiran Kintali
Kiran Kintali 2021 年 6 月 22 日
You can check if this issue is already resolved.
Reproduction steps are highly appreciated for actionable next steps.

カテゴリ

ヘルプ センター および File Exchange で Code Generation についてさらに検索

製品

質問済み:

2017 年 11 月 13 日

回答済み:

2021 年 6 月 22 日

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by