Why feasibility always zero? what does it mean? thx
古いコメントを表示
I use fmincon to do the optimization:
End diagnostic information
First-order Norm of
Iter F-count f(x) Feasibility optimality step
0 5 4.405383e-01 0.000e+00 7.795e-01
1 10 6.294627e-02 0.000e+00 1.920e-01 1.258e+00
2 15 2.902131e+02 0.000e+00 2.095e+01 8.519e+01
3 20 2.590246e+02 0.000e+00 1.978e+01 5.210e+01
4 25 4.631491e+02 0.000e+00 2.644e+01 2.449e+02
5 30 4.482603e+01 0.000e+00 8.201e+00 3.028e+02
But feasibility always zeros, what does it mean? many thanks
採用された回答
その他の回答 (1 件)
Alan Weiss
2015 年 1 月 12 日
2 投票
You can find the meaning of the fmincon iterative display here. You will see there that feasibility 0 means that the current point is feasible, meaning that all constraints are satisfied at that point.
Alan Weiss
MATLAB mathematical toolbox documentation
2 件のコメント
Matt J
2015 年 1 月 13 日
Hi Alan,
I think it would be helpful to have links to that page in the section of the fmincon documentation that describes the Display option. Same thing for other solvers.
Alan Weiss
2015 年 1 月 13 日
That's a good idea, Matt. I'll get on it.
Alan Weiss
MATLAB mathematical toolbox documentation
カテゴリ
ヘルプ センター および File Exchange で Solver Outputs and Iterative Display についてさらに検索
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!