photo

Karl-Martin


2014 年からアクティブ

Followers: 0   Following: 0

統計

  • Thankful Level 1
  • Revival Level 1
  • First Answer

バッジを表示

Feeds

表示方法

回答済み
arima estimate error with garch
Allthough you did specify Q=1, the parameter can be excluded from the model. In the 'garch.m' function of the Econometrics to...

9年以上 前 | 1

回答済み
Error using garch/validateModel; Non-zero degree P requires a non-zero degree Q.
Hi Jason, I got this error in my modelling too and I suppose it happens to occur as follows: In the 'garch.m' function...

9年以上 前 | 0

質問


How to show 95% quanile in a Boxplot ?
Hi, I want to compare the forecast performance of Value at Risk (VaR) from two different models by using a boxplot. Put diffe...

9年以上 前 | 1 件の回答 | 2

1

回答

回答済み
Estimate GARCH(4,1) using estimate: Parameter GARCH{2} is missing
Nevermind, I found the solution. In the 'garch.m' function of the Econometrics toolbox it is stated: % o The coefficients...

9年以上 前 | 0

| 採用済み

質問


Estimate GARCH(4,1) using estimate: Parameter GARCH{2} is missing
Hi, I want to fit an AR(1) Model to a time series of returns (x) and the variance process follows a GARCH(4,1) model. mo...

9年以上 前 | 1 件の回答 | 1

1

回答

質問


Do my Toolboxes work?
Hi, I want to fit a Conditional Variance Model, given some specified data, using: model = arima('ARLags',1,'Variance',ga...

9年以上 前 | 2 件の回答 | 0

2

回答

質問


How to plot data with corresponding dates
I have a vector with data (1x9324 double) and another vector (1x9324 cell) with the corresponding dates. Both vectors are from ...

10年弱 前 | 1 件の回答 | 0

1

回答