現在この提出コンテンツをフォロー中です。
- フォローしているコンテンツ フィードに更新が表示されます。
- コミュニケーション基本設定に応じて電子メールを受け取ることができます
This is a model of the system in example 16.9 in Power System Analysis book, Stevenson. Three-phase fault is applied at time 20 s and the fault is cleared at 20.3 s. 20 s was chosen to study the fault effect after the system reaches steady state operating conditions. You can zoom in the time interval 20-20.3 in the scope to observe the rotor swinging under fault. The critical clearing time is approximately 0.55 s; it differs from that mentioned in the book since the system in this model employs PSS for each machine, which is more related to real world systems.
引用
Hamzeh Jamal (2026). Multi Machine Stability (https://jp.mathworks.com/matlabcentral/fileexchange/50117-multi-machine-stability), MATLAB Central File Exchange. に取得済み.
| バージョン | 公開済み | リリース ノート | Action |
|---|---|---|---|
| 1.0.0.0 |
