If I call matlabpool open 4 and I have 4 cores, will I work in parallel with 4 or with 3 workers?
1 回表示 (過去 30 日間)
古いコメントを表示
Hi, I have a desktop machine with 4 cores available. 1) I wonder whether, calling a pool of 4 workers with the PCT, there will be 4 workers working in parallel, or just 3 since 1 is the client. 2) Working with a cluster workstation (with MDCS), when I connect to the master node (client), I run my code in parallel calling "n" workers, and I want to compare the simulation time of the parallel computation with that of the sequential one (I want to see the speedup). For the sequential computation, should I call in the master node matlabpool open 1 (calling 1 slave node from the master node) or should I work directly with the master node, than I don't need to call a matlabpool? Thank you in advance.
0 件のコメント
採用された回答
Thomas
2013 年 7 月 12 日
編集済み: Thomas
2013 年 7 月 12 日
If you call matlabpool open local 4 - you will have 4 workers (though you will have 5 matlab instances running - 1 master ans 4 workers)
To study speedup you can just run the code sequentially on the master- I do not think you need to start a matlabpool with 1 worker. (I would also convert my 'parfor' to a regular 'for' while running sequentially)
0 件のコメント
その他の回答 (1 件)
参考
カテゴリ
Help Center および File Exchange で Parallel Computing Fundamentals についてさらに検索
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!