I have a system which is quite a bit complicated and is a dynamical system with Stiff requirements. There is a particular gain value which controls the settling time substantially in the final output. I want to plot all the outputs from the resulting variations of that gain. How can I achieve this?
More importantly, that gain causes a waterbed effect(tradeoff between settling time and overshoot) how can I optimise to get the gain value which gives a early settle as well as a robust model. Note the minimum value of the gain is 3.

1 件のコメント

Subhransu Sekhar Bhattacharjee
Subhransu Sekhar Bhattacharjee 2021 年 4 月 15 日
Please note the maximum acceptable value of the gain is 50, sampled at a difference of 5.