decrease resource amount in resource pool
4 ビュー (過去 30 日間)
古いコメントを表示
大家好
hello everyone
Please answer to me, how can I decrease resource amount in resource pool via signal port?
increase is not problem , with message.data = x, i can increase on x items.
but how about decrease.
thanx a lot
1 件のコメント
Joep Eijkenduijn
2021 年 4 月 13 日
Hi Ivan,
I don't know how to decrease the amount of resources. Documentations say it is not possible. But I have found a simple workaround:
Build the following system outside of your main system:
Entity generator: 1/s
First server: server time, you put the time point at which the decrement in resources must happen. Server capacity = infinite.
Resource acquirer: acquire the amount of resources by which you want it to decrease.
Second server: Server time, long enough that it will keep the entity during the entire simulation. Capacity = 1.
And last a terminator.
This system holds the resources during the simulation which in practice seems like a decrease. Hope this helps.
回答 (0 件)