Matlab Simulink RepMat Execution Time
1 回表示 (過去 30 日間)
古いコメントを表示
Dear All,
I need a significant help.
I have a Simulink model that has a subsystem that takes a matris [3x1] and makes it [3x11] by just adding them side by side. Normally we were doing that with vector concatenate and it takes nearly 1 ms. With time optimization processes, we decreased that to 0.95 ms but that is too much for us. We need to decrease that value at least half of 1 ms.
My function is basically a repmat. And it takes nearly 0.95 ms on the hardware.
Since operation is not complex at all, we believe that there should be a less time-consuming way.
Any help will be appreciated.
Thanks.
1 件のコメント
Ameer Hamza
2020 年 12 月 1 日
Have you inspected the generated code? That might give some hints on why it is taking too long.
回答 (1 件)
Walter Roberson
2020 年 12 月 1 日
persistent idx11
if isempty(idx11)
idx11 = ones(1,11);
end
y = u(:, idx11) ;
0 件のコメント
参考
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!