フィルターのクリア

Time varying state bounds in model predictive control

2 ビュー (過去 30 日間)
Sai Kumar
Sai Kumar 2020 年 5 月 21 日
コメント済み: Sai Kumar 2020 年 7 月 21 日
Dear Community,
I am trying to implement time varying state constraints in my nmpc model. The documentation says it is possible, but i am trying to find an example to understand it more better for implementation.
To breif more on the problem :
  1. I want to vary my state bounds over the prediction horizon from time k+1 to k+p with p the prediction horizon.
Thanks in advance.
  5 件のコメント
Giulio Borrello
Giulio Borrello 2020 年 7 月 20 日
Hi, I have the same problem, i'm tryng to use time-varying output constraint at run time using the classical (linear) MPC block in simulink. Has anyone managed to solve this problem? Thank you
Sai Kumar
Sai Kumar 2020 年 7 月 21 日
hey giulio, try to create a an inequality constraint or try using mpc designer app since you are dealing with linear MPC. They provide an option to have run time constraints.

サインインしてコメントする。

回答 (1 件)

Sai Kumar
Sai Kumar 2020 年 5 月 21 日
Tired out but not getting the desired results.
Since i am using simulink to run my controller, its making it more difficult.

カテゴリ

Help Center および File ExchangeController Creation についてさらに検索

製品


リリース

R2019b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by