Time varying state bounds in model predictive control
2 ビュー (過去 30 日間)
古いコメントを表示
Dear Community,
I am trying to implement time varying state constraints in my nmpc model. The documentation says it is possible, but i am trying to find an example to understand it more better for implementation.
To breif more on the problem :
- I want to vary my state bounds over the prediction horizon from time k+1 to k+p with p the prediction horizon.
Thanks in advance.
5 件のコメント
Giulio Borrello
2020 年 7 月 20 日
Hi, I have the same problem, i'm tryng to use time-varying output constraint at run time using the classical (linear) MPC block in simulink. Has anyone managed to solve this problem? Thank you
回答 (1 件)
参考
カテゴリ
Help Center および File Exchange で Controller Creation についてさらに検索
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!