I am trying to use binary GA for optimal appliance scheduling and electricity cost minimization. I am getting good results if i just consider one appliance i.e. every run gives almost the same cost solution and narrowly varying schedule.If i have multiple appliances i dont get an optimal solution at all. Every run gives a wide varying solution for both cost minimisation and scheduling. Any idea what might cause this??
Lucy.
  1 件のコメント
Adhulya PV
Adhulya PV 2022 年 4 月 12 日
I am also working in same area can you share me the code

サインインしてコメントする。

回答 (1 件)

David Cho
David Cho 2017 年 8 月 5 日
Hi, could you show me your code?