how to speed my code up

1 回表示 (過去 30 日間)
cglr
cglr 2019 年 11 月 16 日
コメント済み: Daniel M 2019 年 11 月 17 日
Hello everone,
Here, line 4 and 5 is called 5525575680 times and they last 280 and 230 seconds in order. May I speed it up, how can I use it more efficient ?
1 function [utilization] = totalUtilization(myArray, periodNumber, count, LPP)
2 duration = 0;
3 for i = 1:count
4 duration = duration + myArray(periodNumber, i);
5 end
6 utilization = duration / LPP;
7 end
Thanks in advance.
  1 件のコメント
cglr
cglr 2019 年 11 月 16 日
Because, I still can't get used to ability of MATLAB :) .
You are exactly true and no need to loop for sum or etc. I wrote the function taking into account to your comment:
utilization = sum(myArray(periodNumber,:)) / LPP;
Thank you so much.

サインインしてコメントする。

採用された回答

Daniel M
Daniel M 2019 年 11 月 16 日
編集済み: Daniel M 2019 年 11 月 16 日
Why do you need a loop to compute a sum? Just replace the entire function with
utilization = sum(myArray(periodNumber, 1:count)) / LPP;
And if count is equal to the number of columns of myArray, replace "1:count" with just ":" to avoid making an extra temporary index.
If periodNumber happens to be a vector, then include the number 2 as the dimension input into sum.
  4 件のコメント
cglr
cglr 2019 年 11 月 17 日
actually table is a regular array with the size (period,telCount). And I can ask the question in a better way as seen below:
x = zeros(period,1);
for i=1:period
x(i,1) = sum(table(i,1:telCount));
end
Here what I want is, sum all column for each row and write result to x array.
Daniel M
Daniel M 2019 年 11 月 17 日
You really enjoy writing loops! But you don't need to. Look up the documentation for the sum function. It shows you how to do just that.

サインインしてコメントする。

その他の回答 (0 件)

カテゴリ

Help Center および File ExchangeLoops and Conditional Statements についてさらに検索

タグ

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by