Baseline criteria in Test Manager: Is there any method to recapture the baseline criteria and replace the .mat file?

1 回表示 (過去 30 日間)
I am having more than 100 test cases for a model. When I make any changes to the main model the baseline criteria has to be replaced. Is there any method for replacing the baseline criteria if multiple test cases are available?

回答 (1 件)

Rong Mi
Rong Mi 2018 年 8 月 8 日
You can try to create 100 iterations instead of having 100 test cases for one model. So in each iteration, you can add a corresponding baseline file for it.