Using for loop for plotting from a timetable?

3 ビュー (過去 30 日間)
Hydro
Hydro 2017 年 12 月 23 日
コメント済み: Peter Perkins 2018 年 1 月 5 日
Attached is a sample of my data that I would like to plot. I would like to use for loop to automate plotting from the timetable directly. Below is my code, however, it seems there is some problem. any thoughts would be appreciated. I would also like to get a handle to enhance the plot further.
for ii=1:2
plot(TT2.Date,TT2.(:,ii))
end

採用された回答

Walter Roberson
Walter Roberson 2017 年 12 月 23 日
編集済み: Walter Roberson 2017 年 12 月 23 日
plot(TT2.Date, TT2{:,ii})
... and remember the "hold on"

その他の回答 (1 件)

Peter Perkins
Peter Perkins 2017 年 12 月 28 日
I imagine that
plot(TT2.Date,TT2{:,1:2})
would also work. And if there's only two variables in your timetable, that's equivalent to
plot(TT2.Date,TT2.Variables)
where "Variables" is the default name to use, but it's whatever TT2.Properties.DimensionNames{2} is set to.
  2 件のコメント
Hydro
Hydro 2017 年 12 月 28 日
Thanks Peter. There are a number of variables (~10). It would be very inconvenient to plot them one by one, that's why I want to use the loop to automate the plotting.
Peter Perkins
Peter Perkins 2018 年 1 月 5 日
You only think you want a loop. This
plot(TT2.Date,TT2{:,1:2})
plots them both at once, without a loop.

サインインしてコメントする。

カテゴリ

Help Center および File ExchangeLoops and Conditional Statements についてさらに検索

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by