Predict power consumption using linear regression

4 ビュー (過去 30 日間)
Hkl
Hkl 2022 年 10 月 28 日
コメント済み: Star Strider 2022 年 10 月 28 日
I want to predict power consumption per hour with this data using linear regression.
How can i do this?

採用された回答

Star Strider
Star Strider 2022 年 10 月 28 日
There are 89 days in the data, so the data ‘wrap’ to 24 hours.
T1 = readtable('https://www.mathworks.com/matlabcentral/answers/uploaded_files/1172328/data2022.csv', 'VariableNamingRule','preserve')
T1 = 2159×5 table
time power_consumption(MW) temperature(¡ÆC) humidity(%) insolation(MJ/m2) ____ _____________________ ________________ ___________ _________________ 1 808.08 3.3 66 0 2 776.95 3.2 59 0 3 753.25 3 62 0 4 750.78 2.5 61 0 5 753.73 2.2 67 0 6 768.75 2.2 68 0 7 790.86 1.5 71 0 8 801.18 0.9 74 0.01 9 760.35 2 71 0.21 10 631.42 6.3 52 0.91 11 562.01 7.7 42 1.5 12 524.11 8.5 41 1.93 13 503.51 8.2 40 2 14 527.51 8.7 42 1.83 15 554.49 8.2 40 1.41 16 636.05 7.5 42 0.56
VN = T1.Properties.VariableNames;
nrDays = nnz(T1.time == 24)
nrDays = 89
mdl = fitlm(T1.time, T1.('power_consumption(MW)'))
mdl =
Linear regression model: y ~ 1 + x1 Estimated Coefficients: Estimate SE tStat pValue ________ _______ ______ __________ (Intercept) 698.61 5.0312 138.86 0 x1 5.2509 0.35226 14.906 6.6857e-48 Number of observations: 2159, Error degrees of freedom: 2157 Root Mean Squared Error: 113 R-squared: 0.0934, Adjusted R-Squared: 0.093 F-statistic vs. constant model: 222, p-value = 6.69e-48
[y,yci] = predict(mdl, T1.time);
figure
plot(T1.time, T1.('power_consumption(MW)'), '.')
hold on
plot(T1.time, y, '-r')
plot(T1.time, yci, '--r')
hold off
grid
xlabel(VN{1})
ylabel(strrep(VN{2},'_','\_'))
.
  4 件のコメント
Hkl
Hkl 2022 年 10 月 28 日
I appreciate it.
Star Strider
Star Strider 2022 年 10 月 28 日
As always, my pleasure!

サインインしてコメントする。

その他の回答 (1 件)

Florian Bidaud
Florian Bidaud 2022 年 10 月 28 日
Hi,
You can use the function polyfit with x being the time and y being the power consumption, you will have to choose n to fit your data as you want. In your data, I guess when the time comes back to 1 it means it's another day ? Then you will need to change 1,2,3,..., 23 to 25,26,27,....47 for the second day and so on

カテゴリ

Help Center および File ExchangeDescriptive Statistics についてさらに検索

製品


リリース

R2022b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by