Predict power consumption using linear regression

3 ビュー (過去 30 日間)
Hkl
Hkl 2022 年 10 月 28 日
コメント済み: Star Strider 2022 年 10 月 28 日
I want to predict power consumption per hour with this data using linear regression.
How can i do this?

採用された回答

Star Strider
Star Strider 2022 年 10 月 28 日
There are 89 days in the data, so the data ‘wrap’ to 24 hours.
T1 = readtable('https://www.mathworks.com/matlabcentral/answers/uploaded_files/1172328/data2022.csv', 'VariableNamingRule','preserve')
T1 = 2159×5 table
time power_consumption(MW) temperature(¡ÆC) humidity(%) insolation(MJ/m2) ____ _____________________ ________________ ___________ _________________ 1 808.08 3.3 66 0 2 776.95 3.2 59 0 3 753.25 3 62 0 4 750.78 2.5 61 0 5 753.73 2.2 67 0 6 768.75 2.2 68 0 7 790.86 1.5 71 0 8 801.18 0.9 74 0.01 9 760.35 2 71 0.21 10 631.42 6.3 52 0.91 11 562.01 7.7 42 1.5 12 524.11 8.5 41 1.93 13 503.51 8.2 40 2 14 527.51 8.7 42 1.83 15 554.49 8.2 40 1.41 16 636.05 7.5 42 0.56
VN = T1.Properties.VariableNames;
nrDays = nnz(T1.time == 24)
nrDays = 89
mdl = fitlm(T1.time, T1.('power_consumption(MW)'))
mdl =
Linear regression model: y ~ 1 + x1 Estimated Coefficients: Estimate SE tStat pValue ________ _______ ______ __________ (Intercept) 698.61 5.0312 138.86 0 x1 5.2509 0.35226 14.906 6.6857e-48 Number of observations: 2159, Error degrees of freedom: 2157 Root Mean Squared Error: 113 R-squared: 0.0934, Adjusted R-Squared: 0.093 F-statistic vs. constant model: 222, p-value = 6.69e-48
[y,yci] = predict(mdl, T1.time);
figure
plot(T1.time, T1.('power_consumption(MW)'), '.')
hold on
plot(T1.time, y, '-r')
plot(T1.time, yci, '--r')
hold off
grid
xlabel(VN{1})
ylabel(strrep(VN{2},'_','\_'))
.
  4 件のコメント
Hkl
Hkl 2022 年 10 月 28 日
I appreciate it.
Star Strider
Star Strider 2022 年 10 月 28 日
As always, my pleasure!

サインインしてコメントする。

その他の回答 (1 件)

Florian Bidaud
Florian Bidaud 2022 年 10 月 28 日
Hi,
You can use the function polyfit with x being the time and y being the power consumption, you will have to choose n to fit your data as you want. In your data, I guess when the time comes back to 1 it means it's another day ? Then you will need to change 1,2,3,..., 23 to 25,26,27,....47 for the second day and so on