PI Controller Tuning for totem pole Pfc
古いコメントを表示
Hi all,
I am working on simulating a Totem-Pole Bridgeless PFC on Simulink. I have developed the control system and need to tune the PI values for the PI controller.
I was referring this video to tune the controllers: https://www.mathworks.com/videos/active-power-factor-correction-1546869199547.html
Since the video is for a Boost PFC, the control system is a little different when compared to a Totem-Pole PFC.
I tried the tuning with help of sisotool by find the transfer function using small signal analysis ,and found the kp and ki but the desired response is not coming.The transfer function is shown below as a code
% the controller transfer function
clc;
clear all;
s=tf('s');
Vin=230;
V0=400;
d=0.1868;
L=2.0634e-4;
C1=0.0042;
R=48.48;
fs=65000;
Ts=1/fs;
%Gid=(Vin*(2+R*C1*s))/(R*(1-d^3)*((C1*L*s^2)/((1-d)^2)+((L*s)/R*((1-d)^2))+1));
Gid=V0/(1+s*L*R);
Gvd=(Vin*R)/(2*V0*(s*R*C1 +1));
I have attached my simulation file ,Please Help me guys
%the parameters which I used
clc
clear all;
Vin=input("Enter the value ")
fline=50;
Vinpeak=sqrt(2)*Vin;
V0=400;
V0_min=380;
Po=3300;
n=0.95;
t_holdup=10e-3;
Iin=Po/(n*Vin);
fsw=65000;
D=(1-(Vinpeak/V0));
deliin=Iin*0.30;
delvo=0.025*V0;
L=(Vinpeak*D)/(fsw*deliin);
Cpower=Po/(2*pi*fline*delvo*V0);
Choldup=(2*Po*t_holdup)/(V0^2-V0_min^2);
cap=max(Cpower,Choldup);
Ts = 1/(100*fsw); % Sampling time for the plant [sec]
Tsc = 1/(50*fsw); % Sampling time for the controller [sec]
Iinpeak = 2*(Po/(n*0.01))/Vinpeak;

6 件のコメント
Not expert, but what are the desired responses expected from the outputs of
and
?
and
?s = tf('s');
Vin = 230;
V0 = 400;
d = 0.1868;
L = 2.0634e-4;
C1 = 0.0042;
R = 48.48;
fs = 65000;
Ts = 1/fs;
% Gid = (Vin*(2+R*C1*s))/(R*(1-d^3)*((C1*L*s^2)/((1-d)^2)+((L*s)/R*((1-d)^2))+1))
Gid = V0/(1 + s*L*R)
Gvd = (Vin*R)/(2*V0*(s*R*C1 + 1))
Barath Narayanan
2022 年 9 月 30 日
Sam Chak
2022 年 9 月 30 日
@Barath Narayanan, thanks for your reply.
However, I'm unsure if I understand your meaning of "not working"?
If the responses of
and
settle at 1 second, are they acceptable?
and
settle at 1 second, are they acceptable?
Barath Narayanan
2022 年 9 月 30 日
Barath Narayanan
2022 年 9 月 30 日
Usman
2023 年 7 月 30 日
do you have the example for multiphase buck converter control?
採用された回答
その他の回答 (1 件)
Barath Narayanan
2022 年 10 月 2 日
0 投票
3 件のコメント
Sufi
2023 年 5 月 23 日
Hello Barath,
Did you figure a way out in finding the PI values for current and voltage controller. I am facing the same problems as you!
Barath Narayanan
2023 年 5 月 23 日
Sufi
2023 年 5 月 24 日
How did you get the PI values and PR values? What procedure did you follow to get it correctly?
カテゴリ
ヘルプ センター および File Exchange で Loop-Shaping Design についてさらに検索
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!












