Info

この質問は閉じられています。 編集または回答するには再度開いてください。

Controlling the NextHitValue in a large simulink file

1 回表示 (過去 30 日間)
Anfänger
Anfänger 2014 年 4 月 14 日
閉鎖済み: MATLAB Answer Bot 2021 年 8 月 20 日
Is there a way to control the simulation step in simulink? I am having a large file, where each block is user defined Matlab Level2 S-function. Within each block, I have implemented a necessary condition for stability, which enables me to get the maximum time step for which the current block will be stable. This means, that for the complet file, I have to take the smallest time step from all blocks and set iteratively, the NextHitValue of the individual blocks to this value. How can I do that without using global variable?

回答 (0 件)

製品

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by