I have a model for xPC in which I have different masked subsystems. As they do different tasks, they need to run with different timesteps (some do fast acquisition, others need longer time to run and do communication or other slow tasks). Subsystems trigger each other (start each other - obviously the faster one is in control).
How can I define the sampling time of a subsystem (and all components inside)?
I'm using fixed step solver. What timestep do I need to set for it? - the shortest one that I use in any subsystem?
Thank you for any suggestion.
-any single core solution out there?
0 件のコメント
採用された回答
Azzi Abdelmalek
2014 年 2 月 11 日
編集済み: Stefanie Schwarz
2023 年 10 月 14 日
Try a zoh block just before your subsystem and set sample time of your subsystem blocks to inherited
Add
If your subsystem doesn't contain a continuous block, right click on your subsystem, click on block parameter(subsystem) then check treat as atomic unit, and set your sample time
4 件のコメント
Azzi Abdelmalek
2014 年 2 月 11 日
The zoh is used before a continuous blocks. Its input is maintained the same until the next sample. The zoh doesn't delay anything.
If your subsystem doesn't contain a continuous block, right click on your subsystem, click on block parameter(subsystem) then check treat as atomic unit, and set your sample time
その他の回答 (0 件)
参考
カテゴリ
Help Center および File Exchange で Subsystems についてさらに検索
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!