Different start and stop time within a system in Simulink
2 ビュー (過去 30 日間)
古いコメントを表示
Is it possible to make some sort of subsystem that has different start and stop time of the simulation? I would like to built a simulation with Start time 0 and Stop time at 200, and inside this main model, I want to make a subsystem that would have a Start time at 20 and Stop time at 50.
Is there any way i can achieve it? Cheers
0 件のコメント
採用された回答
その他の回答 (0 件)
参考
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!