Matrix-based Flexible Project Planning

Matrix-based flexible project planning, scheduling, and risk analysis for traditional, agile, and hybrid project management
ダウンロード: 75
更新 2021/2/20
This tool contains traditional, agile, and hybrid project management planning, scheduling, and risk analysis techniques. The algorithms are based on the following papers:
First, please use DEMO.m
Implemented Scheduling Problems:
CTCTP: Continuous Time-Cost Trade-off Problem
DTCTP: Discrete Time-Cost Trade-off Problem
CTQCTP: Continuous Time-Quality-Cost Trade-off Problem
DTQCTP: Discrete Time-Quality-Cost Trade-off Problem
RC-CTCTP: Resource-Constrained Continuous Time-Cost Trade-off Problem
RC-DTCTP: Resource-Constrained Discrete Time-Cost Trade-off Problem
RC-CTQCTP: Resource-Constrained Continuous Time-Quality-Cost Trade-off Problem
RC-DTQCTP: Resource-Constrained Discrete Time-Quality-Cost Trade-off Problem
MRCPSP: Multimode Resource-Constrained Project Scheduling Problem
MRCPSP-Q: Multimode Resource-Constrained Project Scheduling Problem with Quality parameters
Agents:
TPMa: Traditional Project Management agent (see mtpma.m)
APMa: Agile Project Management agent (see mapma.m)
HPMa: Hybrid Project Management agent (see mhpma.m)
EPMa: Extreme Project Management agent (APMa + unplanned tasks)
Phases of Risk Analysis:
Phase 1: Uncertainty of demands
Phase 2: Shock effects
Phase 3: Structural changes

引用

Kosztyán, Zsolt T. “An Exact Algorithm for the Flexible Multilevel Project Scheduling Problem.” Expert Systems with Applications, vol. 158, Elsevier BV, Nov. 2020, p. 113485, doi:10.1016/j.eswa.2020.113485.

その他のスタイルを見る

Kosztyán, Zsolt Tibor (2024). Matrix-based Flexible Project Planning (https://github.com/kzst/GENALG_PDM/releases/tag/1.0.2), GitHub. 取得済み .

Kosztyán, Zsolt T., et al. Survive IT! Survival Analysis of IT Project Planning Approaches. Elsevier BV, 2020, p. 100170, doi:10.1016/j.orp.2020.100170.

その他のスタイルを見る

Kosztyán, Zsolt T., and István Szalkai. Multimode Resource-Constrained Project Scheduling in Flexible Projects. no. 1, Springer Science and Business Media LLC, Oct. 2019, pp. 211–41, doi:10.1007/s10898-019-00832-8.

その他のスタイルを見る

Kosztyán, Zsolt T. Exact Algorithm for Matrix-Based Project Planning Problems. no. 9, Elsevier BV, June 2015, pp. 4460–73, doi:10.1016/j.eswa.2015.01.066.

その他のスタイルを見る

Kosztyán, Zsolt T., and István Szalkai. Hybrid Time-Quality-Cost Trade-off Problems. Elsevier BV, 2018, pp. 306–18, doi:10.1016/j.orp.2018.09.003.

その他のスタイルを見る

Kosztyán, Zsolt T. “MFPP: Matrix-Based Flexible Project Planning.” SoftwareX, vol. 17, Elsevier BV, Jan. 2022, p. 100973, doi:10.1016/j.softx.2022.100973.

その他のスタイルを見る
MATLAB リリースの互換性
作成: R2020b
R2015a 以降のリリースと互換性あり
プラットフォームの互換性
Windows macOS Linux

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

バージョン 公開済み リリース ノート
1.0.2

See release notes for this release on GitHub: https://github.com/kzst/GENALG_PDM/releases/tag/1.0.2

この GitHub アドオンでの問題を表示または報告するには、GitHub リポジトリにアクセスしてください。
この GitHub アドオンでの問題を表示または報告するには、GitHub リポジトリにアクセスしてください。