Power load cycle using GUIDE MATLAB GUI
The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].
We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files
引用
Tamir Suliman (2024). Power load cycle using GUIDE MATLAB GUI (https://www.mathworks.com/matlabcentral/fileexchange/39624-power-load-cycle-using-guide-matlab-gui), MATLAB Central File Exchange. 取得済み .
MATLAB リリースの互換性
プラットフォームの互換性
Windows macOS Linuxカテゴリ
タグ
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!loadcycle/
バージョン | 公開済み | リリース ノート | |
---|---|---|---|
1.0.0.0 |