Image Acquisition - preview is fast, snapshot is slow?
11 ビュー (過去 30 日間)
古いコメントを表示
Why is the snapping of frames so slow?
It seems that preview can be used with a callback to do real-time processing of images. However, snapping a frame, then calculating and displaying the result is very slow.
What is the best way to approach (quasi) real-time video processing?
0 件のコメント
回答 (1 件)
David Tarkowski
2013 年 1 月 28 日
I think that this example might help with your issue: http://www.mathworks.com/help/imaq/examples/acquiring-a-single-image-in-a-loop.html.
1 件のコメント
Andraz Skoda
2016 年 6 月 8 日
編集済み: Andraz Skoda
2016 年 6 月 8 日
What happens with time needed for one frame if we store the frame in Matlab variable every time in a manualy trigger mode loop? Did anybody already tested it?
I'm working on application that also needs real-time snapshoting and every frame must be processed. Processing can also be done after all frames are captured. So we take for example 20 pictures (we must come under 5 seconds) and after this, process them.
Any suggestions, ideas or results of testing this kind of application with Matlab?
参考
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!