Hi guys,
I'm now struggling how to realize the time-history loading in the app designer.
My problem is simple that I have a time periods of rainfall as well as Intensity for each during. In the original main file I use "heaviside function" like this:
i_q = -(1/3600)*[0.0365 0.0697 0.0996 0.0493 0.0153]; %FOR STEP LOADING: vector of rainfall intensity steps [m/s]
T_q = 2*3600*[0.1 0.24 0.45 0.78 1]; %FOR STEP LOADING: vector of time intervals of rainfall intensities (2 hrs)
q = @(t) (i_q(1).*(heaviside(t)-heaviside(t-T_q(1)))+ i_q(2).*(heaviside(t-T_q(1))-heaviside(t-T_q(2))) + i_q(3).*(heaviside(t-T_q(2))-heaviside(t-T_q(3))) + i_q(4).*(heaviside(t-T_q(3))-heaviside(t-T_q(4)))...
+ i_q(5).*(heaviside(t-T_q(4))-heaviside(t-T_q(5))));
which means when t lies in the first time interal (0<=t<=2*3600*0.1), the intensity will be the first elenment of i_q and so on, the time-intensity plot likes below:
Now in the app desinger, I want to let the user define their own time-history rainfall intensity (the length of column can depend on themselves) and load from excel file.
Could you please help me to figure it out?
Thank you very much!

回答 (0 件)

カテゴリ

Help Center および File ExchangeDevelop Apps Using App Designer についてさらに検索

タグ

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by