Running referenced model in parent model
1 回表示 (過去 30 日間)
古いコメントを表示
Hello,
I do not now if it's necessary to activate a referenced model, hopefully it can be done activating a subsystem too:
I have water in my boiler, i also have the ammount of water i need in all the upcomming 15 minutes(all day) stocked into an excel file. When my amount if water that i need is bigger then the ammount my boiler contains i want to activate a sybsystem.
This subsystem would then count how many more 15 minutes i can survive on the current water i have in my boiler by checking each upcomming 15 minutes how many water is needed. When the boiler is empty i want to get the time when it get's empty.
So for example after 2 hrs my subsystem could get triggered. But then i do not want my subsystem to run for 1 step but for the entire day. Only when that is done i want my main model to go forther to the next step (so to 2 hrs and 15 minutes)
Thx,
Kris
0 件のコメント
回答 (1 件)
Kaustubha Govind
2012 年 6 月 6 日
You should probably use an Enabled Subsystem and create a control signal that goes high (>0) after 2hrs and remains high throughout the day - the subsystem is enabled as long as the enable signal is high..