PV Plant Simulation (100KW)
1 回表示 (過去 30 日間)
古いコメントを表示
Hi Guys,
There is a model of 400 KW PV plant in simulink. I want to increase PV plant capacity by 2 times(800 KW) , 3 times(1200 KW) and so on. is there any way i can change to plant capacity without changing the parameters by using multiplication, addition etc. I can not connect same plant on parallel because i want to keep increasing plant size upto 30 MW. Please help me guys.
Thank you in advance