how to run a simulation at different times

4 ビュー (過去 30 日間)
sandeep
sandeep 2022 年 10 月 10 日
回答済み: Benjamin Thompson 2022 年 10 月 10 日
I would like to run my model, lets say 3 days at 40C temperature and 4days at 60C and so on.
As per my understanding and trail, i have used a if block and merge the signals, is it right?
how can i change that time and input value to simulate? iw ould like to see how it's changing with time and temperature.
have a look at the attachments for better view, any views and guidance?

回答 (1 件)

Benjamin Thompson
Benjamin Thompson 2022 年 10 月 10 日
You can use the Signal Builder block to configure how you want a signal to change over time. I assume you are simulating the model one time for seven days total.